The bathroom in it's current state, except we have the floor and toilet ripped out.
The start of our tile. The color looks darker since I took this picture at night. I'll post another one when we're done which will hopefully happen next weekend. It'll probably take another week or two to get the bathroom done.
I have no kitchen. I'm not kidding, I literally have no kitchen. The remodeling has officially begun which means I currently have a fridge and a stove in my entryway. Everything else that used to be in the kitchen is in my dining room (or other various areas of the house) and anything that didn't get thrown out from the fridge is either crammed into our small chest freezer downstairs or sitting in a coolor on my back porch. We only have hot water in the kitchen sink and the bathroom sink is unusable until we fix the plumbing to the sink in the main floor bathroom. So I'm on my way after work to pick up plastic forks, plates and pizza. I have a feeling we've got a few days of eating out in our future.
Don't get me wrong I'm super excited to get going on the project but that doesn't mean I'm also not excited to get it done. I'll post pics tonight of the before and the progress and when it's done I'll for sure post the finished product or mostly finished since we've got a few weeks of touch up work after the tile is laid! Wish us luck.
Friday, January 4, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Oh my gosh - your house sounds and looks a lot like my in-laws house. They are remodeling a ton in their place! That construction dust is awful, isn't it?! Good luck!
I look forward to seeing more photos of the finished products!
Post a Comment